Commercial · Completed

Thistle Bar Refurbishment, Alloa

Full commercial strip-out and refurbishment of Thistle Bar, Junction Place, Alloa — bar, seating, joinery, finishes and outdoor works now complete.

Location 1-22 Junction Place, Alloa FK10 1JWTimeline CompletedPhotos 87

Project gallery

Thistle Bar exterior, Junction Place, Alloa
Thistle Bar exterior, Junction Place, Alloa
Thistle Bar Alloa — existing bar counter before strip-out
Thistle Bar Alloa — existing bar counter before strip-out
Thistle Bar Alloa — behind the bar looking into the lounge
Thistle Bar Alloa — behind the bar looking into the lounge
Thistle Bar Alloa — lounge strip-out and floor works in progress
Thistle Bar Alloa — lounge strip-out and floor works in progress
Thistle Bar Alloa — interior renovation underway
Thistle Bar Alloa — interior renovation underway
Thistle Bar Alloa — seating area clearance and prep
Thistle Bar Alloa — seating area clearance and prep
Thistle Bar Alloa — commercial kitchen ahead of refit
Thistle Bar Alloa — commercial kitchen ahead of refit
Thistle Bar Alloa — bar and lounge works in progress
Thistle Bar Alloa — bar and lounge works in progress
Thistle Bar Alloa — internal strip-out detail
Thistle Bar Alloa — internal strip-out detail
Thistle Bar Alloa — trade works on site
Thistle Bar Alloa — trade works on site
Thistle Bar Alloa — strip-out debris and bar sink removal
Thistle Bar Alloa — strip-out debris and bar sink removal
Thistle Bar Alloa — renovation progress through the venue
Thistle Bar Alloa — renovation progress through the venue
Thistle Bar Alloa — opening-up and clearance works
Thistle Bar Alloa — opening-up and clearance works
Thistle Bar Alloa — commercial interior during refurbishment
Thistle Bar Alloa — commercial interior during refurbishment
Thistle Bar Alloa — site progress through the bar
Thistle Bar Alloa — site progress through the bar
Thistle Bar Alloa — floor strip and exposed brickwork
Thistle Bar Alloa — floor strip and exposed brickwork
Thistle Bar Alloa — full ceiling strip-out and joinery setup
Thistle Bar Alloa — full ceiling strip-out and joinery setup
Thistle Bar Alloa — structural and first-fix works
Thistle Bar Alloa — structural and first-fix works
Thistle Bar Alloa — interior construction progress
Thistle Bar Alloa — interior construction progress
Thistle Bar Alloa — stud framing and wall preparation
Thistle Bar Alloa — stud framing and wall preparation
Thistle Bar Alloa — ongoing commercial building works
Thistle Bar Alloa — ongoing commercial building works
Thistle Bar Alloa — refurbishment works continuing on site
Thistle Bar Alloa — refurbishment works continuing on site

Update 17 July

Update 17 July — structural props, steel and timber framing underway
Update 17 July — structural props, steel and timber framing underway
Update 17 July — plasterboard partitions and doorway framing
Update 17 July — plasterboard partitions and doorway framing
Update 17 July — boarded walls with first-fix wiring and plumbing
Update 17 July — boarded walls with first-fix wiring and plumbing
Update 17 July — timber framing, OSB and electrical rough-in
Update 17 July — timber framing, OSB and electrical rough-in
Update 17 July — OSB enclosure and cable runs through the joists
Update 17 July — OSB enclosure and cable runs through the joists
Update 17 July — stud partitions, boarding and materials on site
Update 17 July — stud partitions, boarding and materials on site
Update 17 July — lounge framing, ceiling grid and joinery setup
Update 17 July — lounge framing, ceiling grid and joinery setup
Update 17 July — custom circular feature framing on the feature wall
Update 17 July — custom circular feature framing on the feature wall
Update 17 July — open ceiling, partitions and plasterboard delivery
Update 17 July — open ceiling, partitions and plasterboard delivery

Update 24 July

Update 24 July — plasterboard walls, ceiling boarding and materials on site
Update 24 July — plasterboard walls, ceiling boarding and materials on site
Update 24 July — boarded lounge with first-fix wiring and temporary lighting
Update 24 July — boarded lounge with first-fix wiring and temporary lighting
Update 24 July — boarded walls, concrete floor and site workbench
Update 24 July — boarded walls, concrete floor and site workbench
Update 24 July — boarded bar area with props and electrical rough-in
Update 24 July — boarded bar area with props and electrical rough-in
Update 24 July — plasterboard corridor and doorway framing
Update 24 July — plasterboard corridor and doorway framing
Update 24 July — ceiling boarding, ducting and first-fix services
Update 24 July — ceiling boarding, ducting and first-fix services
Update 24 July — boarded interior with timber and plasterboard stocks
Update 24 July — boarded interior with timber and plasterboard stocks
Update 24 July — timber delivery, boarding progress and service mark-ups
Update 24 July — timber delivery, boarding progress and service mark-ups
Update 24 July — open lounge, boarded ceiling and window line works
Update 24 July — open lounge, boarded ceiling and window line works
Update 24 July — plasterboard fit-out and MultiFinish plaster ready for skim
Update 24 July — plasterboard fit-out and MultiFinish plaster ready for skim
Update 24 July — boarded walls, hanging circuits and window bay
Update 24 July — boarded walls, hanging circuits and window bay
Update 24 July — original Thistle Bar beam retained through the fit-out
Update 24 July — original Thistle Bar beam retained through the fit-out
Update 24 July — plaster stocks, boarded walls and retained heritage lintel
Update 24 July — plaster stocks, boarded walls and retained heritage lintel
Update 24 July — boarded corridor ready for second-fix works
Update 24 July — boarded corridor ready for second-fix works
Update 24 July — steel columns, props and ceiling works continuing
Update 24 July — steel columns, props and ceiling works continuing

Update 17 September

Update 17 September — bar carcass framing and joinery cutting on site
Update 17 September — bar carcass framing and joinery cutting on site
Update 17 September — finished bar top edge joinery detail
Update 17 September — finished bar top edge joinery detail
Update 17 September — dark-stained curved bar top ready for fit
Update 17 September — dark-stained curved bar top ready for fit
Update 17 September — painted finishes, seating joinery and site tools
Update 17 September — painted finishes, seating joinery and site tools
Update 17 September — green feature columns and bar carcass progressing
Update 17 September — green feature columns and bar carcass progressing
Update 17 September — joinery cutting and green wall panelling underway
Update 17 September — joinery cutting and green wall panelling underway
Update 17 September — curved bar frame with services installed
Update 17 September — curved bar frame with services installed
Update 17 September — finished bar top on trestles ready for install
Update 17 September — finished bar top on trestles ready for install
Update 17 September — long stained oak bar top grain detail
Update 17 September — long stained oak bar top grain detail
Update 17 September — installed bar counter and back-bar framing
Update 17 September — installed bar counter and back-bar framing
Update 17 September — dark feature wall with circular porthole windows
Update 17 September — dark feature wall with circular porthole windows
Update 17 September — curved bar front panels and back bar under construction
Update 17 September — curved bar front panels and back bar under construction
Update 17 September — wall panelling and seating joinery in progress
Update 17 September — wall panelling and seating joinery in progress
Update 17 September — timber mouldings and banquette base underway
Update 17 September — timber mouldings and banquette base underway

Completed — 9 September

Completed — dartboard feature wall and lounge seating
Completed — dartboard feature wall and lounge seating
Completed — banquette seating and high-top tables
Completed — banquette seating and high-top tables
Completed — bar counter, stools and neon back bar
Completed — bar counter, stools and neon back bar
Completed — lounge banquette and neon feature wall
Completed — lounge banquette and neon feature wall
Completed — outdoor picnic seating on turf
Completed — outdoor picnic seating on turf
Completed — back bar, taps and neon signage
Completed — back bar, taps and neon signage
Completed — high-top seating and patterned stools
Completed — high-top seating and patterned stools
Completed — bar run with parquet floor and glass racks
Completed — bar run with parquet floor and glass racks
Completed — enclosed beer garden with picnic tables
Completed — enclosed beer garden with picnic tables
Completed — window seating with Thistle branding
Completed — window seating with Thistle branding
Completed — curved tiled bar front and access hatch
Completed — curved tiled bar front and access hatch
Completed — main bar aisle and dining seating
Completed — main bar aisle and dining seating
Completed — outdoor courtyard seating
Completed — outdoor courtyard seating
Completed — banquette seating along the window line
Completed — banquette seating along the window line
Completed — back bar taps and neon feature lighting
Completed — back bar taps and neon feature lighting
Completed — washroom vanity and finishes
Completed — washroom vanity and finishes
Completed — lounge seating and gallery wall
Completed — lounge seating and gallery wall
Completed — dining area with neon and banquette
Completed — dining area with neon and banquette
Completed — bar counter and terracotta tile front
Completed — bar counter and terracotta tile front
Completed — high stools against the green panelled wall
Completed — high stools against the green panelled wall
Completed — lounge seating toward the street windows
Completed — lounge seating toward the street windows
Completed — bar service area with refrigerators and neon
Completed — bar service area with refrigerators and neon
Completed — washroom sinks and tiled finishes
Completed — washroom sinks and tiled finishes
Completed — open lounge with patterned seating
Completed — open lounge with patterned seating
Completed — banquette and gallery wall detail
Completed — banquette and gallery wall detail
Completed — toilet vanity with sage cabinetry
Completed — toilet vanity with sage cabinetry
Completed — feature seating and ambient lighting
Completed — feature seating and ambient lighting